New-build low carbon teaching building providing classrooms, labs and studios

The Brunel Building

To accommodate significant growth in demand for spaces at South Gloucestershire and Stroud College, this project was commissioned to create new sixth form teaching space for more than 300 students at one of the college's campuses, providing a mixture of classrooms, studios, a human performance lab, a lecture theatre and a cybercafe.

I am delighted with the fantastic development of this new centre for high tech skills at SGS. The build will provide increased capacity in the area for the next generation of scientists, technicians, engineers, and creatives and inspire them to push harder to achieve their educational goals.

Kevin Hamblin

SGS Group Chief Executive

To accommodate significant growth in demand for spaces at South Gloucestershire and Stroud College, this project was commissioned to create new sixth form teaching space for more than 300 students at one of the college's campuses, providing a mixture of classrooms, studios, a human performance lab, a lecture theatre and a cybercafe.

Our team was responsible for cost management of developing designs, followed by analysis and scrutiny of market testing and agreement of the contract sum.

The brief changed considerably through the design stages with the college opting for a low carbon cross-laminated timber frame building in favour of the traditional steel frame originally proposed.

Initial market testing came in considerably over budget, meaning value engineering options which reduced costs but did not compromise quality or the college’s brief were essential.

Photos by Hewitt Studios LLP - Copyright © 2008-2021

Selection of the low carbon cross-laminated timber frame was embraced, with the team quickly completing additional designs to maintain completion within programme.

A value engineering workshop was held with the full project team where proposals were tabled by all members. This collaborative approach meant the contractor was happy to proceed while value engineering solutions were being finalised and the contract sum was being agreed, meaning progress against the programme could be maintained.

Photos by Hewitt Studios LLP - Copyright © 2008-2021

Key info

Client

South Gloucestershire and Stroud College

Status

Complete

Management

Cost and commercial management

Sector

Education

Location

Bristol